Case Studies

  •  Full interior demolition and layout to convert former office space into dance studios

  •  Worked closely with owner and architect to procure due diligence for change of use and permitting

  • New finishes, lighting, and flooring throughout while maintaining as many existing MEPs as possible

  • Raze existing 3,000SF building coordinate all municipality and utility permits for safety
  • Renovation of sales floor and offices
  • Relocation of bathrooms, removal of platforms
  • Upgrade HVAC, Electrical
  • Phased project taking place within a live store
  • Design build due diligence to work with board and meet their budget
  • Site work to support 30’x40’ pavilion
  • Concrete ramps, platform with detached utility booth and control booth
  • CMU piers wrapped with decorative stone
  • Menacing Galvy steel frame, topped with glue lams and standing seam roof system
  • Concealed power and runs for AV IT stage lighting/sound

We have built out testing laboratories, corporate office space and common dining areas for Nuance from the East Coast to Mid West over the last few years. Most projects BIC was engaged for pre-con to identify the business goals, perform space analysis and bring project from permit ready to close out.

  • Sound attenuating rooms
  • Specialty MEP infrastructure
  • High end stainless steel reveals and finishes through office spaces
  • Fitness and Locker Room additions
  • Lifting of workstations while OCCUPPIED to perform flooring and painting scope
  • Constant communication, daily between superintendent and Nuance team during 2 separate shifts at some projects
  • 3,000SF 2 story addition for expanded dental offices
  • Storm water infiltration system, subsurface upgrades and parking lot expansion
  • High level of coordination with owners and staff during building tie it
  • Retrofit for new fire suppression and fire alarm systems

 

Build-It Construction worked closely with owner’s project manager and condo board to design and renovate all common areas through two buildings.

  • (2) 5 story condo buildings, over 4,000 LF of 5 piece wainscoating
  • 24” tall 6 piece crown molding systems at entry
  • New ceilings, flooring, wall finishes through 10 floors of corridors
  • Complete gut and reno of entry lobby areas and mezzanine
  • Close coordination with residents and management to mitigate as much of the invasive work as possible

This project is a fantastic example of design building to meet a specific budget for our customer. All finishes, and selections were carefully chosen as a team between owner and builder.

  • Site development within an existing community
  • Careful selection of higher end finishes to fit budget constraints
  • Close coordination with owner throughout preconstruction and construction
  • The result- a beautiful building

Complete Kitchen, Bath, Living Area, and Entry Finishes and Fixtures rehab of over 1,200 Apartment Units. Schedule, schedule, schedule. This project allowed us to display how to effectively manage 30 crews turning over 5-6 units per week, every week, for 50 straight weeks through Process, Pre-Planning, and Schedule. BIC is proud to have devised a system to effectively manage and turn over high volume, high frequency rehabs throughout 4 separate locations.

  • Managed 30 Crews across 4 Locations
  • Turned over 5 Units at a time over a 5-7 day Turn Schedule per Unit
  • Units consisted of New Bathrooms and New Kitchens
  • Pre-Packaged Inventory Deliveries specific per unit type were created
  • This project was all about schedule and maintaining quality control

Many projects from in house floor refinishing to dormitory upgrades. However THIS  project is we are extremely proud to present as 100% self performed from: Demolition, Structural, Siding, Roofing, Masonry, Paint, Finish, etc. A Historic building required close coordination with street covenants and the academy. Details from the hold backs of the shutters to mimic exact shades of black and white at the chimney were all held to.

  • 50% of exterior wall structure was compromised
  • Series of hoist/tackle mortise/tenon strengthening and supplemental lumber to shore up exterior walls and floor joists throughout.
  • Renovation of kitchens and baths
  • Intricate rain screen detail with new siding and windows throughout
  • All parts/pieces to conform to historical covenants

Construction of two massive salt storage structures. Both publicly owned Both performed in a time frame and quality better than every contractor before us, and a fact. Element of design build with regard to truss fabrication and installation method.

  • Pre-Engineer truss framing with span of 70’ feet!
  • Heavy PT post and timber construction
  • HIGH level of safety due to vertical heights of over 40’
  • Supplemental lateral support wall systems
  • Earth work, finish grade, pavement, power, paint
  • One of the best run NHDOT projects ever