Proudly serving MA, ME and NH

Case Studies

Engaging and convincing Cambridge Historical Society to restore an otherwise non water tight and non life safety compliant structure with new technology was paramount and achieved. From paint colors to gutter materials, our team worked diligently to provide new age materials that would stand the test of time, while not sacrificing any historic elements. This collaboration yielded a successful project for the owner and community.

  • Slate Roof replacement and structural rebuild
  • Brick Chimney rebuilds from attic up
  • Cornice, Fascia, Water Table, Rake and all Exterior Trim removed and replaced
  • Aluminum gutter system and downspouts, painted to emulate original wood system
  • Structure improvements at first and second floor
  • Renovation of conference rooms and offices through the interior

Build-It Construction has performed full exterior envelope restorations and site/parking lot renovations throughout many condo and apartment style complexes throughout MA and NH.

  • Cedar Impressions Siding, Vinyl Siding, Cement Board Siding, Wood Siding
  • Wood framed ramps, Concrete sidewalks, asphalt paving, crack sealing, line striping
  • Tree pruning, general ground maintenance, irrigation
  • Exterior Signage, catch basins, culverts, retention/detention ponds
  • Also performing services for Corporate Office Complexes, Schools and Retail

Build-It and Equity have a 8+ year, over 200 project repeat relationship. Although most of our projects with the Equity team are for new acquisitions and renovations, a few fell into the tragedy category. The backdrop of one of these projects involved a fatality as a result of a building fire. Thus, discrete interfacing with media and the public to ensure a high level of confidentiality was imperative. An extreme level of site protection, safety and security was upheld at all phases of project.

  • Complete MEP infrastructure (including a new fire suppression system and main)
  • Wood frame structural rebuild of entire building
  • Site utility and perimeter sidewalk and parking lot reconstruction
  • Selection and provision of interior finishes (AC’s, Kitchens, Baths, Beds)
  • Further design build scope was added to these projects in order to not only comply with current codes but also improve the overall status of the project

Build-It Construction carefully executed this structural rehab and interior improvements project in a manner which saved the Township north of $200,000 as a result of an accelerated schedule and self performing the majority of this project.

  • Removed and replaced 152 roof trusses in a 2 week period
  • Maintained water tight interior during process
  • Upgraded Life Safety components and interior finishes
  • Project turn over ahead of schedule and under budget

Build-It Construction was retained to manage the planning and design of this 5 story structure in Jamaica Plain. The private investors had never taken on a project of this caliber, however after a full year of pre-planning and detailed pre-construction, the Build-It team was able to bring this project to a permit ready status.

  • Geotechnical analysis, site engineering
  • Full interaction with JP Neighborhood committee and Boston Redevelopment Authority
  • Multiple analysis on number of units to provide as affordable
  • Written spec for all finishes
  • Careful coordination and ownership of Architectural layout, structure and finishes

This project emphasizes collaboration of existing vendor teams. Build-It Construction was vetted and elected to build out the Massachusetts HQ of HB Communications, a global leader of high end audio/video equipment and software. Paired with Baker Design firm, the Build-It team collaborated to coordinate the long overdue renovation of HB’s existing HQ as well as fitup of an additional 7,000 SF of office space.

  • This project had an aggressive buyout to save customer money and material procurement deadline.
  • Front Entry Lobby Relocation
  • Multiple Conference, Huddle, Office Rooms
  • 50% of the fitout space was LIVE environment including production
  • Four separate phases to work to mitigate disruption

MIL (Mass Innovation Labs) hosts over 120ksf of real estate in Kendall Square for incubator biotech  and pharma companies. These spaces are equipped with lab amenities from: BSL 3 Rooms, Shaker stations, Incubators, and Benching Stations. These aspiring start up companies then bring their staff and equipment from infancy to near production. Build-It is a proud partner of MIL and we are excited to continue to grow with them.

  • Negative Pressure, CO2, NO2, BSL 2 and BSL 3 accommodations
  • Full understanding of process for each tenant in order to accommodate MEP infrastructure and process flow uses
  • Tight timelines to complete renovations, all occurring in occupied spaces
  • High level of communication with tenant, owner, property manager to ensure safety, schedule and accurate design

 

Renovations to occupied medical office buildings throughout greater New England area. Complete demolition, relocation and fitup of occupied medical office spaces to accommodate expansion and rebranding of Humana and Concentra businesses.

  • Multi Phased Renovations to accommodate transfer and occupancy of:
  • Waiting Rooms, Exam Rooms, Physical Therapy, Sample Rooms
  • ZERO downtime for customer- NO pause in operations
  • HIPPA and OSHA compliance maintained throughout all phases of construction
  • Coordination of all owner supplied equipment and vendor in tandem with construction

Acid waste, Fume Hoods, Multi Gases, Epoxy Counters are all trademarks of traditional lab space work. Couple that with HEPA systems, epoxy floors, high end casements you achieve a state of the art Chemistry Lab.

  • High level of coordination with facilities and the many utilities required for infrastructure hookup
  • Multiple floors of coordination for routing of piping and through roof
  • Seven Fume Hoods, Five Snorkel Hoods, Three Glove Boxes
  • Performed all work adjacent a live lab space
  • Careful consideration to existing surroundings and scientists during construction

Build-It is pleased to have returned for a second year of restroom renovations at Woodside Hall. Both renovation projects were completed on time and on budget

  • Aggressive Scheduling
  • 55 Restrooms for full renovation within existing dorm rooms
  • Stairwell flooring, walls, painting in 6 separate buildings
  • Intimate knowledge of UNH procedure and material procurement
  • Summer time table – preconstruction was extremely important

Experience.
Vision.
Quality.

Let’s build your dream home.

Let's Stay in Touch

This field is for validation purposes and should be left unchanged.
Name(Required)