VICOR – Andover, MA 2016

5,000SF Infill of Open Space Mezzanine

  • Converted 5,000 SF of ‘open to below’ mezzanine into usable square footage
  • Introduced Structural Steel, Concrete, Flooring, Ceiling, HVAC, Lighting
  • Building operated 3 shifts, thus all steel, welding, and concrete pouring was LIVE
  • Safety guidelines included: Construction of temporary exhaust system for welding operations, full height plywood temporary partitions; heavy use of signage, lighting, walking platforms to conceal concrete pump hoses