UMASS Dartmouth Violette Lab
Dartmouth, MA 2015-16
$1.4 million Chemistry Lab Build Out
- Provided 7 Fume Hoods, 5 Fume Snorkels and 3 Glove Boxes
- Epoxy floor system throughout
- All new plumbing and HVAC infrastructure
- Specialty Acid Waste System
Dartmouth, MA 2015-16
$1.4 million Chemistry Lab Build Out